Ask the Building Department first, especially for a wood stove
The Township's list of work that needs a building permit names installing a wood stove. Its Fees and Charges By-law 2026-22 lists a $228.00 fee for a solid fuel fireplace or heating plant and a $325.00 minimum permit fee, so confirm the total with the Township. Furnaces, air conditioners and heat pumps do not appear, and the Township calls the list incomplete, so the provider should raise the job with the Building Department and settle who files the Cloudpermit application. Once a permit is issued, the permit holder must request each listed inspection, and the by-law sets an administrative fee for building without a permit of half the permit value or $600.00, whichever is greater. Electrical work is separate: ESA treats an electrical permit as different from a building permit, and a job may need both.